7 basic elements contributing to the cost of a change
Monday, December 3, 2012
How do you control the cost of change orders? To begin with, you need to identify the basic elements of the cost of a change:
- Identification of a needed change
- Design process of the change to be made
- Management of the change process
- Additional time needed to make the change
- Labor and materials needed to make the change
- Negative impact of change on completed work
- Labor’s attitude toward dealing with the change